Ouse Bridge Safety Mock Up

Background We’re currently underway with a major bearing replacement scheme on Ouse Bridge which carries the M62 over  River Ouse at Goole. The original structure was built over three years starting in January 1973, spans 1.6km, carries a maximum height at mid-span of 30m and is the final part of the M62 opened in 1976. […]

Read More

Innovative Noise and Restraint Barrier

Background M1 Junction 39 is in the middle of a densely populated area with housing adjacent to the carriageway and slip roads. There have been complaints from residents over many years in relation to the noise, but funding has not been available for noise fencing until now. Scheme background and modelling The location was declared […]

Read More

Two Full-Width Lane Paving

Background Plans to carry out the biggest Yorkshire resurfacing scheme in the last financial year on 54.5 lane kilometres of the M62 between Rothwell and Normanton, junctions 30-31  meant that we had to tackle the tricky task of keeping disruption to an absolute minimum for drivers on this busy stretch. Solution Thanks to our supply partner […]

Read More

High Mast Lighting Improvement Works

Background A 5 kilometre stretch of the M621 between junction 1 and junction 5 required  replacement lighting. Solution We replaced the existing system with 394 high pressure sodium lanterns LED units on 64 high masts. The new LED luminaires are bespoke for high mast lighting and incorporate steerable optics. While the unit is installed in […]

Read More

Alternative Gantry Lighting Technology

Background During a project to replace overhead sign gantry lighting we decided to look at alternative lighting solutions. Solution As part of the project we started to look at the possibility of lengthening the life span of current lighting arrangements while meeting stringent specifications for motorway gantry signage. Working with manufacturer Urbis/Schreder we identified a […]

Read More

iDashboards for Managing Maintenence

Background Re-shaping the maintenance strategy through data intelligence led approach to soft estate asset management. Solution As part of our continuous improvement cycle we applied lean tools and techniques to soft estate asset management. This was aimed at driving out waste from the process, developing an enhanced maintenance strategy aligned to whole life maintenance, resilient […]

Read More

M1 J24 Unique Pinch Point Scheme

Background A-one+ identified an innovative and sustainable improvement of the M1 at junction 24 to overcome severe congestion at the intersection which had traffic queuing on all approaches and regularly affecting the mainline M1 carriageway.   Solution Analysis of the junction showed that heavy congestion was largely as a result of significant traffic flow from […]

Read More

Low Temperature Asphalt Demonstration

Background Investigating the viability and benefits of using warm mix asphalt on the strategic road network. Solution A-one+ collaborated with Lafarge Tarmac on a specific trial project on the A46 at Cossington with the aim of formally recording feasibility of use. This project marked the first time that low temperature asphalt was trialled on the […]

Read More

JuMP Mentoring

Background Aiming to attract, develop and retain the best talent within the industry. Solution Junior and Mid-level Professionals network UK (JuMP) is a multi-faceted approach to skills development. JuMP is run by a network of volunteer colleagues within A-one+ whose parent company is CH2M and with support of senior managers. The scheme was created in […]

Read More

IPV No Strikes Driver Education Programme

Background Between June 2009 and December 2013 A-one+ experienced eight road user strikes on our Impact Protection Vehicles (IPV) while our operatives were working in the live carriageway. Solution The IPV is used on the majority of our work. The rear mounted crash cushion is designed to gradually absorb impact energy and protect our operatives […]

Read More

Employee Recognition ‘ The Grits’

Background An employee survey identified that feeling valued was a key driver for improving engagement. We had an employee of the month scheme and our parent companies provided differing reward schemes. We decided to investigate the motivators highlighted in the survey to develop a bespoke scheme appropriate to the unique A-one+ arrangement. Solution The GRIT […]

Read More

Customer Hub

Background Recognising the importance of placing customer needs at the centre of service delivery A-one+ looked to find a way to pro-actively manage, protect and improve customer experience across all aspects of delivery. Solution We created  a dedicated Customer Hub in 2011 and in 2014 key personnel from Highways England joined the hub to provide […]

Read More

Bluetooth Traffic Management

Background After experiencing a number of delays and congestion while working on a resurfacing scheme we wondered if there was a better way of informing road users in real time. Solution Working with Rennicks MTS, A-one+ carried out operational trials of Bluetooth-enabled traffic management on a resurfacing scheme where there is no overhead gantry signage. […]

Read More

Biomass Harvesting Trials

Background A-one+ takes pride in its corporate social responsibility and is always seeking to provide sustainable solutions to minimise environmental impact both in the services we deliver and in our work place behaviours. Our integrated working delivery group responsible for sustainable solutions tasks itself with sourcing, testing and implementing a range of initiatives to address; […]

Read More

Barrier Master

Background The most common type of Vehicle Restraint System (VRS) seen on UK Highways are steel beams mounted on steel posts which are driven into the ground or set in concrete foundations These barriers are frequently damaged requiring repair or removal. Post removal is a very high risk activity and each year we carry out […]

Read More

Remote Controlled Site Access Gates

Background Traditional traffic management layouts at road closures use manually operated plastic barriers. The operative responsible for enforcement manually opens the gate to allow site access to works vehicles. Historically we have experienced a number of near misses where members of the public attempt to enter a road closure, putting the lives of our road […]

Read More

4G Camera Traffic Control

Background A-one+ is responsible for maintenance on some of the busiest sections of trunk roads in England. Our Enhanced Network Control Centre (ENCC) aims to tackle delays and provide a better service for the travelling public when clearing congestion on the network and communicating delays. Solution Following a successful trial using cameras to monitor traffic flow […]

Read More